Ελληνικά English
sitemap
Search
Heavy Industry » PROJECTS IN GREECE » TURN AROUND PROJECTS



 

Details



 

Details
MECHANICAL WORKS IN TOWERS, REACTORS, TRANSFER LINES, VESSELS, FILTERS AND VALVES AT THE REFINERIES OF ELEFSINA (ELPE) DURING TURN AROUND (T/A) OF THE U-32 FLEXICOKER GSD 2019 MECHANICAL WORKS IN TOWERS, REACTORS, TRANSFER LINES, VESSELS, FILTERS AND VALVES AT THE REFINERIES OF ELEFSINA (ELPE) DURING TURN AROUND (T/A) OF THE U-32 FLEXICOKER GSD 2019


 

Details
TURN AROUND WORKS U-3700 (EQUIPMENT) AT MOTOR OIL HELLAS CORINTH REFINERY TURN AROUND WORKS U-3700 (EQUIPMENT) AT MOTOR OIL HELLAS CORINTH REFINERY


 

Details
UPGRATING WORKS OF UNIT U-3200 / 3300 / 3400 AT MOTOR OIL HELLAS CORINTH REFINERY UPGRATING WORKS OF UNIT U-3200 / 3300 / 3400 AT MOTOR OIL HELLAS CORINTH REFINERY


 

Details
RELOCATION OF THE EASTERN SIDE OF THE CONVECTION L-2001/51, DISMANTLING AND RE-ASSEMBLY AFTER INSPECTION AND REPAIR OF THE SOUTHERN SIDES OF THE FURNACE AT THE REFINERY OF ELPE IN ASPROPYRGOS RELOCATION OF THE EASTERN SIDE OF THE CONVECTION L-2001/51, DISMANTLING AND RE-ASSEMBLY AFTER INSPECTION AND REPAIR OF THE SOUTHERN SIDES OF THE FURNACE AT THE REFINERY OF ELPE IN ASPROPYRGOS


 

Details
ERECTION OF FURNACE F-202N, DISMANTLING F-201A F-201B & F-202 AND ERECTION OF COMBUSTION AIR PREHEATING SYSTEM AT MOTOR OIL HELLAS REFINERIES IN CORINTH ERECTION OF FURNACE F-202N, DISMANTLING F-201A F-201B & F-202 AND ERECTION OF COMBUSTION AIR PREHEATING SYSTEM AT MOTOR OIL HELLAS REFINERIES IN CORINTH


 

Details
REVAMPING OF U-200 FURNACE, ERECTION OF PIPES, PIPE RACK AND INSTALLATION OF INTERNAL OF TOWERS C-201, C-205 AT MOTOR OIL HELLAS REFINERIES IN AGIOI THEODOROI, CORINTHIA REVAMPING OF U-200 FURNACE, ERECTION OF PIPES, PIPE RACK AND INSTALLATION OF INTERNAL OF TOWERS C-201, C-205 AT MOTOR OIL HELLAS REFINERIES IN AGIOI THEODOROI, CORINTHIA


 

Details
MECHANICAL WORKS IN TOWERS, REACTORS, TRANSFER LINES, VESSELS, FILTERS & VALVES AT THE REFINERIES OF ELEFSINA (ELPE) DURING TURN AROUND (T/A) 2017 OF THE U-32 - FLEXICOKER MECHANICAL WORKS IN TOWERS, REACTORS, TRANSFER LINES, VESSELS, FILTERS & VALVES AT THE REFINERIES OF ELEFSINA (ELPE) DURING TURN AROUND (T/A) 2017 OF THE U-32 - FLEXICOKER


 

Details
UPGRADE PROJECT 2 - COKE LOADING SYSTEM START-UP AT THE REFINERIES OF ELEFSINA (B.E.E.) UPGRADE PROJECT 2 - COKE LOADING SYSTEM START-UP AT THE REFINERIES OF ELEFSINA (B.E.E.)


 

Details
REVAMPING WORKS IN  FUELS, PETROL, FCC UNITS REVAMPING WORKS IN FUELS, PETROL, FCC UNITS


 

Details
REVAMPING OF FUEL & PETROL UNITS & EQUIPMENT OF GENERAL SHUT DOWN REVAMPING OF FUEL & PETROL UNITS & EQUIPMENT OF GENERAL SHUT DOWN


 

Details
Displaying 1 to 12 (of 50 products) Result Pages:  1  2  3  4  5  [Next >>] 

Cookies are small text files that are stored in our browser while browsing the web. Their purpose is to notify the site that the user visits for his previous activity. They typically describe our username and password when we visit the same site later, remember us and do not need to login.
 

Learn More ...

These are the cookies used by our website to improve your browsing and temporarily store your preferences.

Disabling them is likely to cause problems in viewing the site .

You can set your browser to block or alert you to these cookies, but some parts of the site will not work properly.